New Layout Parking Lot Striping in Las Vegas, NV

On fresh asphalt, there may be nothing to stripe over. We use the dimensions on your parking plan to lay out rows, aisles and turns before spraying the first line. For a paving job in Las Vegas or Enterprise, send the current drawing along with the paving schedule.

Marked rows of parking spaces on asphalt.

Laying out the first row

We check the position of a curb island before using it as a reference. We measure between fixed points on the lot and check the chalk marks at both ends of a row. If a row runs into a ramp, we stop there and ask for a decision before paint goes down.

When to call

  • New paving or a surface treatment has covered the old row ends.
  • A tenant change moves a driveway or adds a pickup lane.
  • New islands or curb ramps change the usable length of a row.

How we handle the work

  1. Check the drawing revision

    Confirm which sheet governs parking. Include any approved changes to accessible spaces, fire access or loading areas.

  2. Mark the layout on site

    Set a baseline, measure the rows and mark aisle ends. Walk the layout with the site contact where the drawing and pavement differ.

  3. Coordinate with the paving crew

    Check when the surface can accept the specified paint. Schedule striping after other trades no longer need to drive through the work.

Changing stall angles affects how a driver enters the space and how much aisle room is left. Have the project designer resolve changes to the plan with the reviewing authority before striping.

Questions before booking

Can we add another stall at the end of a row?

Show us the proposed change on the drawing. What looks like spare pavement may be turning room or part of an accessible route. Have the designer confirm the revised layout first.

What if all we have is an aerial photo?

It helps locate the work for an estimate. It does not give us reliable stall dimensions. We will identify what needs measuring and whether a revised plan is needed.

Can we stripe as soon as the paving crew finishes?

Check the paving and coating recommendations first. A surface that can carry traffic may not yet be ready for the marking material.